Sign In | Join Free | My enlightcorp.com
China Shenyang Top New Material Co.,Ltd logo
Shenyang Top New Material Co.,Ltd
Shenyang Top New Material Co., Ltd The World's Leading Professional Supplier Of Cobalt Alloy Products
Verified Supplier

9 Years

Home > Cobalt Chrome Alloy >

Investment Casting Process Cobalt Chrome Alloy Better Metallurgical Structure

Shenyang Top New Material Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Investment Casting Process Cobalt Chrome Alloy Better Metallurgical Structure

Brand Name : SYTOP

Model Number : TP002

Certification : ISO9001

Place of Origin : Liaoning,Shenyang

MOQ : 3pcs

Price : USD 6-100/PC

Payment Terms : L/C, T/T, Western Union, MoneyGram

Supply Ability : 30000PCS/MONTH

Delivery Time : 10-25 working days

Packaging Details : foam sheet inside and wooden case outside

chemical composition : CoCrW

Properties : wear and corrosion and high temperature resistance

specfication : upon drawing

Density : 8.4-8.8g/cm3

application : equipment parts

Process : casting and powder metallurgy

OEM : accept

Contact Now

SYTOP cobalt base alloys is a range of cobalt-chromium-tungsten alloys with wear resistance, corrosion and high thermal resistance. It is widely used in oil & gas, machinery, wood cutting, automotive, paper and food processing industry etc.

Material Choose Typical Application Process
ST 6 Steam and chemical valve seat , oil and gas pump sleeve, ,butterfly valve bushing ,hot-dip galvanized production line used bushing etc.

investment casting

ST 3 Pump sleeve ,rotary ring , valve seats
ST 12 Extrusion die , hot impact die and saw teeth
ST 100 Extrusion die , hot-impact die and saw teeth
ST 20 Pump sleeves , rotary rings , bearing sleeves , valve balls

Chemical compositions and properties (%)

Brand C Mn Si Cr Ni Mo W Co Fe P S

Density

(g/cm3)

Hardness

(HRC)

ST 3 2.0-2.7 1.0 1.0 29-33 3.0 11-14 Bal. 3.0 0.03 0.03 8.55 51-55
ST 6 0.9-1.4 1.0 1.5 27-31 3.0 1.5 3.5-5.5 Bal. 3.0 0.03 0.03 8.35 38-44
ST 12 1.1-1.7 1.0 1.0 28-32 3.0 7.0-9.5 Bal. 3.0 0.03 0.03 8.40 44-49
ST 20 2.2-3.0 2.0 30-34 3.0 1.0 14-18 Bal. 3.0 0.05 0.05 8.65 53-59
Tantung-G 25 2.2-2.8 1-3 27-32 7 Ta/Nb 14-19 Bal. 2-5 8.84 57-60
Tantung-G35 3.3-3.8 1-3 27-32 7 Ta/Nb 14-19 Bal. 2-5 8.80 60-63
Tribaloy 400 0.04 2.5-2.7 8-10 27-29 Bal. 55
Tribaloy 800 0.04 3.2-3.6 16-18 27-29 Bal. 58

Production process of our thermowell tube

1. Powder metallurgy process

A. Better metallurgical structure, better strength

B. Various types of automatic pressing machines from 3 tons to 630 tons. The ordered profiles can be very flexible.

2. Investment casting process

Different volume of furnaces, the order quantity can be very flexible.

3. Machining

CNC, lathing, drilling, milling, grinding, wire cutting, polishing

Product Features

Investment Casting Process Cobalt Chrome Alloy Better Metallurgical Structure

Production process

Powder metallurgy pocess. It has better strength than casting parts, better granule structure and avoiding the troubles caused by casting defects.

Investment Casting Process Cobalt Chrome Alloy Better Metallurgical Structure

Company activity :

Investment Casting Process Cobalt Chrome Alloy Better Metallurgical Structure

Investment Casting Process Cobalt Chrome Alloy Better Metallurgical Structure

Investment Casting Process Cobalt Chrome Alloy Better Metallurgical Structure

Related products :

Investment Casting Process Cobalt Chrome Alloy Better Metallurgical Structure

FAQ

Q1: What is the Warranty for our products ?
A1: We own high precision grading machine to control geometry dimensions and apply ultra fine grain size substrate coated with high performance coatings to guarantee the lifetime of our products, which can satisfy every working condition.If any quality problems on our side occurred in this period , we will take on the shipping cost and replacement.
Q2: Do you provide free samples?
A2: Yes, usually we provide free samples for testing under the condition of freight paid by customer.
Q3: What is your minimum order requirement?
A3: We will indicate the MOQ for each item in the quotation sheet. We accept the sample and trial order. If the quantity of single item can't reach the MOQ, the price should be sample price.
Q4: What is the delivery time of your products?
A4: It depends on the inventory availability.If items needed are in stock, the delivery time would be within 8 work days, but if not the delivery time would be around 20 work days.
Q5: Can you manufacture Special-shaped products?
A5: Yes, we can. We can produce both standard and special prosucts. We can make them according to your drawings and samples.
Q6: May I have my order working schedule?
A6: Yes, we will send working schedule of your order each week. We will inspect and test all merchandise in case of damaging and missing parts before shipment. The detailed inspection pictures of the order will be sent to you for your confirmation before delivery.

Package and shipment

Investment Casting Process Cobalt Chrome Alloy Better Metallurgical Structure

Our service

Research and development(R &D):

We have a mature technical team that can assist customers to develop new products and grow together;

Design:

We can provide free design according to the samples or drawings provided by customers;

Customer service:

We can provide complete customer service support, including logistics, technical services, equipment commissioning etc;

Processing:

We can provide OEM manufacturing services according to customer’s demand.

Note: The price is determined by the design drawings and mould size , please provide the drawings or sample data to us, we will give you a quote ASAP(within 8 hours).

Send your inquiry details right now !!!


Product Tags:

cobalt chromium alloy

      

cobalt chrome molybdenum alloy

      
Quality Investment Casting Process Cobalt Chrome Alloy Better Metallurgical Structure for sale

Investment Casting Process Cobalt Chrome Alloy Better Metallurgical Structure Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shenyang Top New Material Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)